NASA administrator Jared Isaacman doubled down on the space agency's ambitious timeline to send astronauts to the Moon in just two years, which would be before the end of President Donald Trump's term. In a speech at the Kennedy Space Center, he reaffirmed the agency is on track to launch Artemis 3 next summer, a mission that won't send astronauts to the Moon but will have them practice docking their spacecraft with lunar landers made either by SpaceX or Blue Origin in Earth's orbit.
The source notes the space agency still hasn't finalized its decision on which vehicle it will use for the landing, describing this as a major point of uncertainty. Artemis IV, still slated for 2028 at the time of writing, is when astronauts will fly to the Moon and land on it for the first time in over half a century, spending a week on the surface conducting scientific missions — if everything goes according to plan.
Isaacman stressed, per the Associated Press, that NASA is now accelerating its pace by cutting down on meetings, bureaucratic inertia and endless deliberation. The source describes this as a striking comment that raises questions of whether pursuing speed could be coming at the expense of thoroughness and safety.
Doubts also remain over whether SpaceX's Starship, one of the spacecraft NASA has selected to carry out the Moon landing and be used in the docking exercise, will be ready in time. The source reports the rocket recently accomplished its first orbit around the planet, but that flight — originally intended to have Starship fly around the Earth six times — was cut short because of an engine failure. SpaceX has yet to prove the rocket is safe enough for a proper mission, on top of other capabilities such as refueling in space.